Render of a 5-star hotel at Lauro Golf, Alhaurín de la Torre, Málaga

Hotel and tourist accommodation projects in Málaga and Costa del Sol

We design, refurbish and convert buildings for hotel and tourist use, combining architecture, regulations, operational functionality and guest experience.

The success of a hotel project depends on far more than its image. Layout, circulation, rooms, common areas, building services, regulations, accessibility and user experience all need to work together from the earliest stages.

At Santos Arquitectos we develop new-build, refurbishment and building-conversion projects for hotel and tourist use in Málaga and the Costa del Sol, accompanying the client from the initial study through to site supervision.

What kind of projects we take on

New-build hotels

Full design of hotel buildings from the preliminary study, the functional programme and the planning process.

Hotel refurbishment

Upgrading of existing hotels: rooms, common areas, accessibility, building envelope and services.

Building conversion

Feasibility studies for converting existing buildings into hotels, tourist apartments or other accommodation.

Tourist accommodation

Projects for tourist apartments, aparthotels, tourist coliving or temporary accommodation buildings.

Extensions and partial renovations

Interventions in receptions, common areas, restaurants, terraces, pools, rooms or facades.

Feasibility before design

Before starting a hotel project, we analyse whether the building or plot can support the intended use. We study planning regulations, buildability, change of use, accessibility, heritage protection, evacuation, building services, room programme and technical constraints.

Permitted planning use

Buildability and site coverage

Change of use

Accessibility

Evacuation and fire safety

Building services and climate control

Rooms and common areas

Balance between investment, works and final result

From the initial study to the works

01

Building or plot analysis

Planning, technical and functional review.

02

Hotel programme

Number of rooms, common areas, services, access, circulation and operator requirements.

03

Preliminary design

First layouts, massing, image and regulatory fit.

04

Design and permit

Technical documentation for the administrative process.

05

Technical design

Construction definition, services, structure, measurements and details.

06

Site supervision

Technical monitoring through to the completion of the works.

Architecture designed for the guest and for daily operations

A hotel must be attractive to those who visit it and efficient for those who run it. That is why we work on clear circulation, the relationship between public and private areas, the spatial quality of the rooms, lighting, materials, maintenance and the integration of building services from the very start of the project.

Knowledge of the tourism context of Málaga and the Costa del Sol

The Costa del Sol has a long hotel and tourism tradition, but also very diverse regulations and urban conditions in each municipality. Our experience in Málaga, Marbella, Torremolinos, Benahavís, Estepona and other municipalities allows us to approach each project from a precise reading of the place, the building and its real possibilities.

What clients usually ask before starting

Can an existing building be converted into a hotel?

It depends on the planning use, municipal regulations, accessibility, evacuation, building services and the condition of the building. The advisable first step is a preliminary feasibility study before making decisions.

Do you work with hotels in operation?

Yes. Works can be phased to minimise disruption to the hotel's activity, as long as the construction process and regulations allow it.

Can you study the feasibility before we buy a building?

Yes. It is one of the most valuable services for investors and owners: knowing the real possibilities and limitations of a building before committing to the investment.

Do you design tourist apartment projects?

Yes, always analysing beforehand the planning and tourism regulations applicable in each municipality.

Do you also handle site supervision?

Yes. We can accompany the whole process, from the initial study through to construction and completion.

Do you own a building or plot with tourism potential?

We can help you study its architectural, planning and technical feasibility before starting the investment or the project.

Request an initial study Message us on WhatsApp